Ares Group would like to advise all road users to expect minor delays during November 2025 to May 2026 for large slowing moving oversize loads, traveling from Perth to Warradarge. 

During this period if you encounter one of the oversize loads please remember to follow the direction of the accompanying heavy vehicle pilot vehicle(s), slow down and stay alert.

Road users are reminded that oversize vehicles travel at a slower pace than normal highway speeds and you may need to stop in order for the oversize load to pull over safely and allow traffic to pass.

To find out more about what to do when you encounter oversized load on the WA road network, visit https://www.mainroads.wa.gov.au/bigger-than-you

Share via
Copy link
Powered by Social Snap